 New Shell Inside
|
 New Shell Outside
|
 Making the first holes
|
 New Inside Bracket
|
 The Bracket Test Installed
|
 Bracket Look Inside
|
 Rivet holes (19) Drilled
|
 Rivets Installed
|
 Dirty Attach Brackets
|
 Clean Attach Brackets
|
 Original Inner Plates
|
 Clean Inner Plates
|
 Axle Bracket for Axle Bolt
|
 Axle Bracket Apart
|
 Attach Bracket Apart
|
 Axle Bracket Clean
|
 Clean Bracket for Flex Bolts
|
 Clean Brackets after Bead Blasting
|
 All Parts ready for Painting
|
 Parts Primed After Prep
|
 All Parts Painted
|
 Clecos holding the outer plate
|
 Inside view of the outer plate
|
 Axle plate installed
|
 Axle hole drilled
|
 New Hardware
|
 Main Shell Primed
|
 Rivnuts in place on Nose
|
 Old nose brackets removed
|
 Nose Brackets after Blasting
|
 Front Fork Mockup
|
 Using Mockup for Position
|
 Aligning mockup for drilling
|
 Front bracket in place for drilling
|
 Bracket holes drilled
|
 Brackets painted prior to install
|
 Holes drilled in nose pant
|
 Bracket sealed and bolted
|
To Be Continued
|